Skip to content
The Creek families
Product installation phase
Integrated architecture
STEP 1
Once the structure has been prepared in the ceiling, the luminaire is positioned in the linear housing.
STEP 2
The luminaire is fixed by inserting the end of the base into the internal housing of the profile.
STEP 3
The process is completed by pressing down the base near the point where the articulated arm starts.
The new Creek structure fits perfectly into the standard centre distance of the mullions of the plasterboard structure with a hole of just 370 mm. The linear profiles, consisting of standard mullions combined with ESP panels, are easily matched in line thanks to the mechanical joint.
Download all images
.zip